Nan"ao Bridge to continue
Connecting Nan’ao and Chenghai district, the Nan’ao Bridge Project has started again after it was delayed in 1997. It is predicted to be continued early in 2008.
The bridge was designed to be 9261 meters long and 35 meters high. This project was started in 1995 and delayed after building biers in 1997 for unknown reasons. The whole project costs 1.2 billion Yuan. [Special Zone Evening]
Shantou Special Zone Evening reports:
http://www.dahuawang.com/localnews/showlocal.asp?no=96815
http://www.dahuawang.com/localnews/showlocal.asp?no=95763